Newsflash:

Pakistan Plans N‑15 Highway Upgrade from Mansehra to China Border

The N 15 Highway from Mansehra to Chilas is being upgraded under CPEC to boost trade, tourism, and northern connectivity.

2 min read

A scenic view of a highway cutting through mountains, representing the N 15 Highway upgrade from Mansehra to Chilas. IC: ProPakistani

A scenic view of a highway cutting through mountains, representing the N 15 Highway upgrade from Mansehra to Chilas. IC: ProPakistani

December 6, 2025

ISLAMABAD – The Government of Pakistan has announced plans to upgrade the N‑15 National Highway, connecting Mansehra in Khyber Pakhtunkhwa to Chilas in Gilgit-Baltistan, as part of its strategic infrastructure development under the China-Pakistan Economic Corridor (CPEC). Spanning approximately 235 kilometers, this project is designed to modernize one of the country’s most important northern corridors, enhancing trade, tourism, and regional connectivity. The National Highway Authority (NHA) has initiated the feasibility and detailed design phase, which includes engineering surveys, environmental impact assessments, and alignment planning to ensure the route meets international standards.

Highway Upgrade and Design Features

The N‑15 Highway upgrade will convert the existing two-lane road into a four-lane, high-standard expressway, with multiple tunnels and bridges to navigate the challenging terrain of the Himalayan foothills. The project is expected to provide all-weather access, significantly reduce travel time, and improve road safety in a region prone to landslides and seasonal disruptions. By connecting northern districts more efficiently with Mansehra and linking onward to the Karakoram Highway, the upgraded N‑15 will serve as a crucial artery for commerce, logistics, and tourism in Gilgit-Baltistan and northern Khyber Pakhtunkhwa.

Economic and Strategic Importance

Economically, the highway is projected to facilitate smoother movement of goods and people, opening new opportunities for local businesses and tourism operators. The strategic importance of this corridor extends beyond national interests, as it strengthens trade and logistical connectivity with China, complementing the broader goals of CPEC. Local communities are expected to benefit from enhanced accessibility, increased employment opportunities during the construction phase, and long-term economic development.

Funding and Future Timeline

While the detailed project cost and financing structure have not been officially disclosed, the initiative is expected to be funded through federal allocations, with potential for public-private partnership (PPP) involvement in the later stages. The NHA’s current focus remains on finalizing the feasibility study, detailed engineering design, and environmental assessments. Construction timelines and tender announcements will follow after these preliminary stages are completed.

The N‑15 upgrade underscores Pakistan’s commitment to sustainable infrastructure development, addressing both geographic challenges and socio-economic needs. Once complete, it will not only improve travel efficiency but also bolster trade corridors, enhance tourism potential in northern Pakistan, and strengthen regional integration with neighboring China. This project is seen as a critical step in improving the country’s northern connectivity, fostering economic growth, and reinforcing Pakistan’s role in regional trade networks.

Related Articles

DG ISPR press conference warns that a single man’s narrative threatens national security and aims to divide people from Pakistan’s armed forces.
Pakistan supports China’s position on Zangnan (Arunachal Pradesh) after Beijing rejects India’s claim and comments on a transit incident.
OICCI Business Confidence Survey reports an 11-point jump to +22%, with rising investment, and rapid AI adoption in Pakistan.
HRCP condemns police harassment of Aurat March activists in Karachi, urging authorities to respect civic spaces for all citizens.

Post a comment

Leave a Reply

Your email address will not be published. Required fields are marked *